Back to course

Final Challenge: Divide the Bill by Two

FinOps for Scalable Infrastructure

The Exam

You are given 60 minutes to refactor the initial 'Money-Bleeding' Terraform script.

Constraints

  1. Website must remain reachable (100% uptime).
  2. Load testing must pass (performance constraint).
  3. Final estimated bill must be 50% lower than the start.

Grading

Points are deducted for unused volumes, lack of tags, and expensive instance types where cheaper ones suffice.